Gaiergy Corp
Schedule a consultation
Scroll to descend↓
Insights

Every figure cited at the point of use.

Analysis and perspective on energy markets, policy developments and emerging technologies, drawn from our project experience rather than press releases.

Research and analysis

Open research documents.

Each one is a complete, standalone document. Every figure inside is cited at the point of use.

Financing report

Energy Contracts to Finance Public Batteries

How a city, county, state, school, airport, housing agency, nonprofit or federal agency can pay for a battery from the savings it makes, with an energy savings performance contract (ESPC) or a utility energy service contract (UESC), and why 25 years of operations and maintenance decide the outcome. Worked examples from New York, New Jersey and California. 174 pages, 58 figures and 334 cited sources (statutes, regulator orders, federal program guides and official data), each listed with its web address and the date it was accessed. A PDF download is on the page.

Open the document →
Governance report

Governance and Operations of Thermal Energy Networks

A guide for states, cities and their partners to three linked choices for a thermal energy network (TEN): who owns it, how it sells service and how it is paid for. It covers state law, owner types, lessons from power, water and district energy, bonds, paying a network back over 40 to 60 years and a checklist, with worked examples from Baltimore, New York City and Boston. 63 pages, 20 figures and 128 cited sources (statutes, regulator orders, IRS rulings and official reports), each accessed September 30, 2026. A PDF download is on the page.

Open the document →
3D digital twin

Hunts Point Digital Twin: A Thermal Energy Network for the Bronx Food Distribution Center

An interactive 3D model of the Hunts Point Food Distribution Center in the Bronx, New York. It shows the buildings that the proposed thermal energy network would serve, the network phases and routes, the wastewater plant as a heat source and the Ocean Water Thermal Exchange (OWTX) site. Sources: New York City Economic Development Corporation (NYCEDC), Thermal Energy Network Financing, Development, Ownership & Operations Request for Expressions of Interest (RFEI), March 10, 2026; NYC Open Data building footprints, tax lots and Local Law 84 energy benchmarking.

Open the model →
3D digital twin

Everett Docklands Digital Twin: The Site Today and the Master Plan

An interactive 3D model of the Everett Docklands site in Everett, Massachusetts. It shows the oil tanks and buildings on the site today, and the master plan blocks and buildings drawn over them. Source: the Everett Docklands Innovation District Master Plan Special Permit Application, submitted to the City of Everett by Everett Landco, LLC (no date printed; PDF created April 18, 2025), and its appendices.

Open the model →
3D digital twin

Sunset Park Digital Twin: The Brooklyn Waterfront in 3D

An interactive 3D model of the Sunset Park waterfront in Brooklyn, New York. Each waterfront building shows its size, its owner of record and its reported energy use. Sources: NYC Open Data building footprints, Primary Land Use Tax Lot Output (PLUTO) tax lots and Local Law 84 energy benchmarking.

Open the model →
Feeder screening tool

Gaiergy Grid Studio: How Big a Battery Fits on a New York Circuit

Gaiergy's own feeder study tool. It runs the Electric Power Research Institute (EPRI) OpenDSS power flow engine on National Grid's public circuit data to find the equipment a battery needs to charge and discharge at a chosen point. Five real New York connection points show that the voltage of the line decides how big a battery fits. Screening results on ESTIMATE inputs; the utility sets the real answer in its own study. Sources: National Grid New York System Data Portal; NYS Standardized Interconnection Requirements, February 9, 2026; National Grid ESB 756 (2024); EPRI OpenDSS.

Open the tool →
Explainer

ICAP Capacity Payments Under New York VDER: Alternatives 1, 2 and 3

How New York's investor-owned utilities pay a 5 MW battery for capacity under Value Stack Alternative 3, how solar and wind are paid under Alternatives 1 and 2, the summer discharge plan that covers the one hour that counts, and what the 2027 rate may do. Sources: NYSEG PSC No. 120 Rule 40; NYISO peak load records 2022 to 2025; Potomac Economics 2025 State of the Market; NYSRC 2027-2028 IRM study.

Open the document →
Position paper

Two Electricity-Demand Panics, Twenty-Five Years Apart

In 1999 the forecasts said the internet would consume half the grid. It did not. Today the same certainty attaches to artificial intelligence and data centers. This paper compares the two episodes.

Open the document →
Battery storage

What a US Battery Project Actually Costs in 2026

Line-item capital costs for grid-scale storage, built from seller-posted pricing rather than survey averages.

Open the document →
Market thesis

Battery Opportunities in PJM

The case for storage in the PJM Interconnection after the capacity price run-up, and where in the footprint it lands best.

Open the document →
Field guide

The New York Electricity Marketplace

How the New York Independent System Operator (NYISO) works, and where storage earns inside it. The document to share when a partner asks what Installed Capacity (ICAP) means.

Open the document →
Incentives

The Indexed Storage Credit Is a Floor, Not a Stack

A decision tree for New York's Indexed Storage Credit (ISC), and the common mistake of treating it as additive to market revenue.

Open the document →
Markets

Resource Adequacy: One Idea, Fifty Points of View

Every grid answers the same question about peak demand. Each state answers it with a different yardstick and a very different price on the word "enough".

Open the document →
Siting

Biomass Plants That Have Closed in PJM

Closed and non-operating biomass sites across the PJM footprint, drawn from Form EIA-860M, with the interconnection rights they left behind.

Open the document →
Long-duration storage

US Flow Battery and Iron-Air Manufacturers

Company-by-company contact list, chemistry, product line and commercial status. Anything unconfirmed against the manufacturer's own material is labeled as such.

Open the document →
Analysis

Fighting Words, Fact-Checked

An independent, claim-by-claim analysis of J.P. Morgan's 16th Annual Energy Paper, scored section by section.

Open the document →
Incentives

NY BESS Revenue and Incentive Stack

Ten revenue streams mapped against the New York incentive stack, showing which legally combine and which are mutually exclusive.

Open the document →
Interactive tools

Maps you can screen a site on.

Live layers, built for early-stage siting and interconnection work.

Tool

The CESIR, Explained

An interactive guide to New York's Coordinated Electric System Interconnection Review: the eleven steps, the clocks, who pays, and a cost model you can slide from a simple site to a hard one. Sources: NYS Standardized Interconnection Requirements effective February 9, 2026; National Grid ESB 756 (2024); Joint Utilities CESIR Cost Drivers (2022).

Interactive guide
→
Tool

EIA-860 Generator Site Map

Every generating unit in the Northeast, layered with live transmission and substation infrastructure.

Interactive map
→
Tool

NY Renewable and Data Center Moratorium Map

Municipal restrictions on renewables, storage and data centers across New York State.

Interactive map
→
Tool

Substation and Circuit Map

Enter a New York address to get the serving utility, feeder hosting capacity, nearest distribution and transmission substations, and NYISO queue conflicts.

Interactive map
→
Tool

California Natural Gas Plants, 10 MW and Under

Every small California gas plant that is operating, retired or planned, with live transmission, substation and pipeline layers. Source: U.S. Energy Information Administration Form EIA-860M, June 2026 edition.

Interactive map
→
Tool

Alabama Gas and Biomass Plants, 50 MW and Under

Small Alabama gas and biomass plants, operating and retired, with live transmission, substation and pipeline layers. Source: U.S. Energy Information Administration Form EIA-860M, July 2026 edition.

Interactive map
→
Tool

Illinois Load Zones and Electric Cooperatives

Wholesale market zones overlaid with distribution cooperative territories.

Interactive map
→
Perspectives

Shorter pieces from project work.

Each one sourced at the point of use.

Tell us about your idea or where your project is stuck.

We start at the concept and work through the economics, design, and implementation.

Email
contact@gaiergy.com
Phone
(646) 580-0701
Locations
New York City, NY / Jupiter, FL